Shandong Natural Gas Pipeline Network Zibo Branch LV Switchgear
Date:2015-06-16 Source: LYT Electric

Shandong Natural Gas Pipeline Network Zibo Branch starts from Zibo Transmission Substation of Shandong Natural Gas Pipeline Network Main Line, ending at the joint of Zibo Branch Terminal Station and Cang-Zi Line, with a full length of 98km in horizontal, passing through 11 roads in our city via Boshan District, Zichuan District, Linzi District, Zhandian District and Hi-Tech development zone. Upon completion it will replace the Cang-Zi line as the main gas source of China Petroleum to feed Zibo Area, providing green energy for the rapid growth of Zibo Economy.

We provided Shandong Natural Gas Pipeline Network Zibo Branch with LV switchgears , which are used for the transition, distribution, control, protection and monitoring of power, lighting, power distribution and motor control center.